Skip to main content

Configure Full + Incremental Copy Scheme

Comments

2 comments

  • cPanelLauren
    The backup configuration won't actually store different configurations, like this by default but you could create a cronjob to run the alternate date.
    0
  • iTecan
    Thanks for the reply!! But I'm not looking for different dates, I'm looking for a new complete copy to be generated every Sunday and the following 6 days, incremental on it, and so every week. Thus, in case of recovery, it will be faster, since it only houses 6 days of incrementals on the last complete copy. This case does not appear in your official documentation, but it is a very common case of backup copies. Another solution would be to create a complete and then another configuration with incrementals, but I don't know how to configure CPANEL for this option. The bad thing when configuring incrementals it doesn't let you choose a full base copy, and I don't want to generate a full copy with a task, and then configure incrementals and re-create a new one (doubling the space) From your answer I understand that perhaps through a script and scheduled tasks I can configure this. Could you guide me or give me documentation about it?
    0

Please sign in to leave a comment.